Planning
BSL provides total solutions and concept designs to meet customer requirements (URS) and comply with relevant standards (EU-GMP, FDA, local GMP, cGMP, WHO). After thorough review and extensive discussions with our clients, we carefully develop a detailed and complete design, selecting appropriate equipment and systems, including:
1. Process layout, clean room partitions and ceilings
2. Utilities (chillers, pumps, boilers, mains, CDA, PW, WFI, pure steam, etc.)
3. HVAC
4. Electrical System
5.BMS&EMS
Design
If you are satisfied with our planning service and want to do design for further understanding, we can move into design phase. We usually divide clean room project into the following 5 parts in design drawings for your better understanding. We have professional engineers to be responsible for each part.
Construction Part
● Clean room wall and ceiling panel
● Clean room door and window
● Epoxy/PVC/High-raised floor
● Connector profile and hanger
Utilities Part
● Chiller
● Pump
● Boiler
● CDA, PW, WFI, pure steam, etc.
HVAC Part
● Air handling unit(AHU)
● HEPA filter and return air outlet
● Air duct
● Insulation material
Electrical Part
● Clean room light
● Switch and socket
● Wire and cable
● Power distribution box
BMS&EMS
● Air cleanliness
● Temperature and relative humidity
● Air flow
● Differential pressure
● System Running &Stop
● Audit Trail
● Running Parameter Control